THIS, RECENTLY SURVEYED, PROJECT WAS COMPLETED IN 1994.
16 YEARS OF SERVICE WITH ZERO MAINTENANCE, TWO MAJOR EARTH QUAKES,
AND STILL LOOKS GREAT.
CHEVRON, EUREKA TERMINAL, WOOD, FUEL LOADING DOCK
Polyurethane Type: Elastomeric/Ecosystem® Expansion, Sand filled
Applied to: Approx. 800 ft2 @ 250 mils,
Secondary containment of gasoline and diesel fuel.
Contractor: Paragon Industrial Applications dba PIA, Inc. (805)-462-1355
FOR A LOOK AT THE ORIGINAL CASE HISTORY CLICK THIS LINK: ET-2000, Chevron, Wood Dock